Gold Member Since 2011
Audited Supplier
Foshan Lixin Steel Material Co., Ltd.

Steel Framework, Building Structure, Metal Structure manufacturer / supplier in China, offering Steel Structure Framework Project, Oval Steel Tube Powder Coating Hand Handrail for School Staircase, Good Looking Prefab Steel Frame with Sandwich Roof and Wall Panel and so on.

(/ )

Supplier Homepage Product Light Steel Structure Steel Structure Framework Project

Steel Structure Framework Project

FOB Price: US $55-120 / Square Meter
Min. Order: 5 Tons
Min. Order FOB Price
5 Tons US $55-120/ Square Meter
Get Latest Price
Production Capacity: 5000 Tons/Month
Transport Package: Seaworthy
Payment Terms: T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: light steel structure
  • Standard: GB, SGS
  • Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
  • Life Time of Steel Frame: More Than 50 Years
  • Span: From 10m to 100m
  • Trademark: Lixin
  • Origin: Foshan, Guangdong, China.
  • Type: H-Section Steel
  • Forming: Hot-Rolled Steel
  • Raw Materials: Q235/Q345
  • Roof and Wall Panel: EPS/Rock Wool/Polyurethane/MGO/Cement Foam Panel
  • Packing Method: Flat Pack,Open Top Container,by Steel Skid,etc.
  • Specification: By Customized
  • HS Code: 94060000
Product Description
The building area of these workshops are 15, 000 square meters.

Steel structure building project is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence and so on.

STEEL STRUCTURE MEMBERS PRODUCTION (Fabrication) PROCESS :

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :

Steel Structure Framework Project
Our strong points(advantages) :

1.  Sand blast:  The sand blast effect reach 2.5 high grade,many countries with high standard requirements accept 2.5 grade.

2.  Welding:        Our welders are full of experiences,professional in butt weld,fillet weld,intermittent welding etc.The welding lines are straight,orderly and nice.

3.  Painting:       We use hight pressure airless spraying machine for painting,both the color and the thickness of paint are well-proportioned.

4.  Packing:  (1)  Open top container(advantage:easy to load the steel;disadvantage:high shipping cost,aleak and few quantity);
                        (2)  Closed container with steel skid (advantage:save shipping cost,all members be packed together and reduce friction,the surface of steel members will be much better;save labor cost to unload the steel members).
Send your message to this supplier
Avatar
Ms. Iris Zhou
Sales manager
*From:
To: Ms. Iris Zhou
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now