Gold Member Since 2011
Audited Supplier
Foshan Lixin Steel Material Co., Ltd.

Steel Structure, Steel Skylight, Steel Structure Frame manufacturer / supplier in China, offering Steel Structure Glass House, Three Floors Light Steel Structure Modular House for Accommodation, The Most Economic Temporary Probable Office Building for Maldives and so on.

(/ )

Supplier Homepage Product Light Steel Structure Steel Structure Glass House

Steel Structure Glass House

FOB Price: US $55-105 / Square Meter
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $55-105/ Square Meter
Get Latest Price
Production Capacity: 5000 Tons/Month
Transport Package: Seaworthy
Payment Terms: T/T

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: steel structure skylight
  • Standard: GB
  • Application: Steel Workshop, Steel Fabricated House, Structural Roofing, Frame Part
  • Specification: By Customized
  • HS Code: 94060000
  • Type: H-Section Steel
  • Forming: Hot-Rolled Steel
  • Trademark: Lixin
  • Origin: Foshan, Guangdong, China.
Product Description
Steel structure house is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence and so on.

Steel structure house fabrication process:

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :

Steel Structure Glass House
Send your message to this supplier
Avatar
Ms. Iris Zhou
Sales manager
*From:
To: Ms. Iris Zhou
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now