Customization: | Available |
---|---|
After-sales Service: | Send 3D Steel Frame Mordel for Guide Installation |
Feature: | Durable, Easy to Assemble |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
steel structure building importance calculation factors | 1.Exact size : length * width *height |
2.Wind speed (max speed) | |
3.Snow load (kg/m2 in max situation) | |
4.Earth quake grade (if have) | |
5.Live load and dead load for roof and flooring(special for mutli-floors building) | |
6.The requirements for window and door | |
7.Max height and weight for crane to life | |
8.What are the materials for roof and wall |