• Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
  • Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
  • Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
  • Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
  • Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
  • Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop

Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop

Type: H-Section Steel
Roof and Wall Panel: Cement Foam Panel/Alc Panel/Glass Curtain Wall
Gutter: Color Steel Sheet, Stainless Steel
Door: Silding Door, Roller Door, Steel Door etc.
Span: 10 to 120m
Flooring: Concrete or Cement Board or Plywood
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
LXB-466
Wind Speed
0 to 360km/H
Standard
GB, ASTM, AISI, BS
Trademark
Low-alloy High-tensile Structural Steel, Lixin
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steel Column
Type of Steel For Building Structure
High-Strength Steel
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
After-sales Service
Send 3D Steel Frame Mordel for Guide Installation
Warranty
Material Warranty Period Is 1year Under Normal Use
Carbon Structural Steel
Q345
Transport Package
Seaworthy
Specification
By Customized
Origin
Foshan, Guangdong, China.
HS Code
94069000
Production Capacity
5000 Tons/Month

Product Description

 

Steel Structure Hotel Building Characteristics

Company: Foshan Lixin Steel Material Co., Ltd.

The steel structure hotel building features double H section steel or box steel frames, with male pins welded onto the steel members for secure connection with concrete. This design saves on steel tonnage and concrete costs. Steel decks are used for flooring, allowing for simultaneous installation on each floor. External wall materials, such as aluminum or glass curtain walls, can be customized based on client requirements and design.

Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop
Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop


 

Steel Structure Building

Our multi-floor high-rise steel structure building is designed to meet your specific requirements. The live load and dead load are customizable for hotel, office, shopping mall, commercial, or warehouse projects. The flooring consists of steel beams, purlins, steel decks, and concrete, while the staircase features H-section steel columns, channel steel beams, and checker steel plates.

We offer free installation training in China and can send engineers to guide installation on-site for fast completion. Our prefabricated steel frame and cladding materials undergo cutting, drilling, shaping, welding, rust resistance, painting, and packing for efficient assembly. All steel members are connected securely for fast installation and environmental friendliness.

Steel Warehouse Building

Our steel warehouse building utilizes H-section and C/Z-section frames with profiled steel sheets or sandwich panels for walls and roofs. This third-generation construction method replaces traditional reinforced concrete with its benefits of light weight, larger span, cost-effectiveness, quick building cycle, safety, and aesthetics. Ideal for industrial factories, warehouses, offices, residences, and high-rise buildings.

Steel Structure Members Production Process:

  1. Prepare raw materials: cut steel plates or use international size H-section steel, angle steel, round tubes, square tubes, etc.
  2. Assembly and welding: skilled welders assemble and weld steel members according to drawings.
  3. Sandblast: achieve international grade 2.5 rust resistance after welding and polishing.
  4. Paint: apply paint within 2 hours of sandblasting, offering a variety of colors and brands.
  5. Client inspection: invite clients to inspect fabricated parts before packing.
  6. Packing and loading: securely pack steel structure members for safe transportation.

For detailed drawings and further information, please contact Foshan Lixin Steel Material Co., Ltd.

Double Floors Competitive Price Prefab Steel Structure Mezzanine Warehouse Workshop

 

Welcome to Foshan Lixin Steel Material Co., Ltd.

Our Strong Points:

Sand Blast: Our sand blast effect reaches a high grade of 2.5, meeting the standards of many countries with strict requirements.

Welding: Our experienced welders excel in butt weld, fillet weld, and intermittent welding, ensuring straight, orderly, and high-quality welding lines.

Painting: We utilize high-pressure airless spraying machines for painting, achieving well-proportioned color and paint thickness.

Packing:

  • Open Top Container: Easy to load steel, though with higher shipping costs and potential leakage issues.
  • Closed Container with Steel Skid: Saves on shipping costs, packs all members together to reduce friction, enhances the surface quality of steel, and reduces labor costs for unloading.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
73
Year of Establishment
2011-04-06