• Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building
  • Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building
  • Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building
  • Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building
  • Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building
  • Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building

Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building

After-sales Service: Send 3D Steel Frame Mordel for Guide Installation
Warranty: Raw Materials Warranty 1 Year Under Normal Use
Material: Steel Structure
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Certification: ISO, CE, SGS
Customized: Customized
Customization:
Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
light steel structure
Raw Materials
Q235/Q345
External Wall Design
Brick Wall /Concrete Wall /Glass Curtain Wall
Life Time of Steel Frame
More Than 50 Years
Packing Method
Flat Pack,Open Top Container,by Steel Skid,etc.
Window
Silding Door,Roller Door,Steel Door etc.
Transport Package
Seaworthy
Specification
By Customized
Trademark
Lixin
Origin
Foshan, Guangdong, China.
HS Code
94060000
Production Capacity
5000 Tons/Month

Product Description

This building is total 6 storeies.

Multi-layered Steel Structure is one kind of steel structure. Steel structure project is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence, multi-layered high building and so on.

Mutli-Storeies Steel Thermal Power Station Project Prefabricated BuildingMutli-Storeies Steel Thermal Power Station Project Prefabricated BuildingMutli-Storeies Steel Thermal Power Station Project Prefabricated Building

STEEL STRUCTURE MEMBERS PRODUCTION (Fabrication) PROCESS :

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :

Mutli-Storeies Steel Thermal Power Station Project Prefabricated Building
Our strong points(advantages) :

1.  Sand blast:  The sand blast effect reach 2.5 high grade,many countries with high standard requirements accept 2.5 grade.

2.  Welding:        Our welders are full of experiences,professional in butt weld,fillet weld,intermittent welding etc.The welding lines are straight,orderly and nice.

3.  Painting:       We use hight pressure airless spraying machine for painting,both the color and the thickness of paint are well-proportioned.

4.  Packing:  (1)  Open top container(advantage:easy to load the steel;disadvantage:high shipping cost,aleak and few quantity);
                        (2)  Closed container with steel skid (advantage:save shipping cost,all members be packed together and reduce friction,the surface of steel members will be much better;save labor cost to unload the steel members).

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2011

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
73
Year of Establishment
2011-04-06