Competitive Prefabricated Steel Warehouse Building with Concrete Wall

Product Details
Customization: Available
Type: H-Section Steel
Crane: with or Without (1 to 50 Tons)
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
73
Year of Establishment
2011-04-06
  • Competitive Prefabricated Steel Warehouse Building with Concrete Wall
  • Competitive Prefabricated Steel Warehouse Building with Concrete Wall
  • Competitive Prefabricated Steel Warehouse Building with Concrete Wall
  • Competitive Prefabricated Steel Warehouse Building with Concrete Wall
  • Competitive Prefabricated Steel Warehouse Building with Concrete Wall
  • Competitive Prefabricated Steel Warehouse Building with Concrete Wall
Find Similar Products

Basic Info.

Model NO.
LXB-42
Roof and Wall Panel
EPS/Rock Wool/Polyurethane/MGO/Cement Foam Panel
Gutter
Steel Sheet, Galvanized Steel, Stainless Steel
Raw Materials
Q235/Q345
Span
From 10m to 100m
Packing Method
Flat Pack, Open Top Container, by Steel Skid, etc.
Standard
GB, SGS
Trademark
Carbon Structural Steel, Lixin
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steel Beam
Type of Steel For Building Structure
H-Section Steel
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Carbon Structural Steel
Q345
Transport Package
Seaworthy
Specification
By Customized
Origin
Foshan, Guangdong, China.
HS Code
94060000
Production Capacity
5000 Tons/Month

Product Description

Competitive Prefabricated Steel Warehouse Building with Concrete WallCompetitive Prefabricated Steel Warehouse Building with Concrete Wall

Prefabricated steel structure warehouse and workshop building construction ,built by strong steel frame,steel roof sheet and brick wall.Africa clients like this kind of steel buildings,because its life time more than 50 years and good at protect the goods in good security situation .


Competitive Prefabricated Steel Warehouse Building with Concrete Wall

Steel structure workshop project is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence and so on.


STEEL STRUCTURE MEMBERS PRODUCTION (Fabrication) PROCESS :

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :


Competitive Prefabricated Steel Warehouse Building with Concrete Wall
Please provide the following steel structure building importance calculation factors for quotation :

(1)  Exact size : length * width *height ;
(2)  Wind speed (max speed);
(3)  Snow load (kg/m2 in max situation);
(4)  Earth quake grade (if have) ;
(5)  Live load and dead load for roof and flooring(special for mutli-floors building);
(6)  The requirements for window and door;
(7)   Max height and weight for crane to lift;
(8)   What are the materials for roof and wall ?

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier