Advanced Construction Design Tower Building Steel Structure Frames

Product Details
Customization: Available
Connection Form: Bolt Connection
Crane: with or Without (1 to 250 Tons)
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
73
Year of Establishment
2011-04-06
  • Advanced Construction Design Tower Building Steel Structure Frames
  • Advanced Construction Design Tower Building Steel Structure Frames
  • Advanced Construction Design Tower Building Steel Structure Frames
  • Advanced Construction Design Tower Building Steel Structure Frames
  • Advanced Construction Design Tower Building Steel Structure Frames
  • Advanced Construction Design Tower Building Steel Structure Frames
Find Similar Products

Basic Info.

Model NO.
LXB-100
Roof and Wall Panel
EPS/Rock Wool/Polyurethane/MGO/Cement Foam Panel
Gutter
Color Steel Sheet, Galvanized Steel, Stainless Steel
Door
Silding Door, Roller Door, Steel Door etc.
Span
10 to 120m
Flooring
Concrete or Cement Board or Plywood
Wind Speed
0 to 360km/H
Storey
1-10 Floors
Type
H-Section Steel
Standard
GB, ASTM, BS
Trademark
Low-alloy High-tensile Structural Steel, Lixin
Forming
Hot-Rolled Steel
Member
Steel Column
Type of Steel For Building Structure
High-Strength Steel
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Carbon Structural Steel
Q345
Transport Package
Seaworthy
Specification
By Customized
Origin
Foshan, Guangdong, China.
HS Code
94060000
Production Capacity
5000 Tons/Month

Product Description

Multi-floor  high rise steel structure conctruction tower/hotel /office/shopping mall /commercial /warehouse building , the live load and dead load can follow client's requirements to design and calculate .For this project,the flooring is grouped by flooring steel beam & purlin &steel deck & concrete .The main materials for whole steel frames are steel round tube, the connection part  finish welding in factory. The staircase is grouped by H section steel column &channel steel beam&checker steel plate .We supply free service for trainning installation at China, and in order to satisfy clients' requirements for fast instalation,we can send engineer to project site for guide installation . 
 

Advanced Construction Design Tower Building Steel Structure Frames

Advanced Construction Design Tower Building Steel Structure Frames



Steel structure building is one kind of prefabricated house, both the whole steel frame and cladding materials are all finish fabrication,including cutting,drilling,shaping,assembly ,welding, resist rust,painting and packing .All steel members connected by bolt or screw or pin ,etc. Fast installation and environmental .

Advanced Construction Design Tower Building Steel Structure Frames
Steel warehouse building is one kind of steel structure. Steel structure project is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence, multi-layered high building and so on.

STEEL STRUCTURE MEMBERS PRODUCTION (Fabrication) PROCESS :

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :

Advanced Construction Design Tower Building Steel Structure Frames
Our strong points(advantages) :

1.  Sand blast:  The sand blast effect reach 2.5 high grade,many countries with high standard requirements accept 2.5 grade.

2.  Welding:        Our welders are full of experiences,professional in butt weld,fillet weld,intermittent welding etc.The welding lines are straight,orderly and nice.

3.  Painting:       We use hight pressure airless spraying machine for painting,both the color and the thickness of paint are well-proportioned.

4.  Packing:  (1)  Open top container(advantage:easy to load the steel;disadvantage:high shipping cost,aleak and few quantity);
                        (2)  Closed container with steel skid (advantage:save shipping cost,all members be packed together and reduce friction,the surface of steel members will be much better;save labor cost to unload the steel members).

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier