Guangdong, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
Year of Establishment:
Management System Certification:
OEM/ODM Service
Sample Available

Steel Structure, Steel Skylight, Steel Structure Frame manufacturer / supplier in China, offering Steel Structure Glass House, Structural Steel Fabrication for Prefabricated Metal Workshop Warehouse Construction, Affordable Industrial Workshop and Warehouse Steel Building Frame and so on.

Gold Member Since 2011
Audited Supplier

Steel Structure Glass House

Get Latest Price
Min. Order / Reference FOB Price
1 Set US $55-105/ Set
Port: Foshan, China
Production Capacity: 5000 Tons/Month
Payment Terms: T/T
Type: H-Section Steel
Standard: GB
Forming: Hot-Rolled Steel
Application: Steel Workshop, Steel Fabricated House, Structural Roofing, Frame Part
Transport Package: Seaworthy
Specification: By Customized

You Might Also Like


Basic Info

Model NO.: steel structure skylight
Trademark: Lixin
Origin: Foshan, Guangdong, China.
HS Code: 94060000

Product Description

1. Products Introduction

Steel structure house is the third generation construction. It combines H section and c/z section into the frame with the profiled steel sheet or sandwich panel as the wal and roof. The traditional reinforced concrete construction has aready been taken place by this kind of construction in developed contries. It has many excellent charateristics such as light weight, larger span, less marerial, low cost, less foundation, short building cycle, safe, beautiful, ect. It is widely used in single industrial factory, warehouse, business construction, office, parking lots, residence and so on.

Steel structure house fabrication process:

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )

Please check the details drawings as follow :

Steel Structure Glass House

2. Projects
Steel Structure Glass House

3. Company Profile
Steel Structure Glass House


Send your message to this supplier

avatar Ms. Iris Zhou

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now